In mid-April Tomas Möller was in Wroclaw, Poland with our local sales partner to put another UV system into operation. The complete setup ( up to DN600 ) according to standard industry 4.0 was integrated into a Mercedes Benz Sprinter (5-tons). This gives the contractor company from Wroclaw the opportunity to handle construction sites all over Poland in a flexible and versatile manner.

On two days three application technicians were trained and briefed in all details of the system. As well a testliner was cured above ground to explain the installation procedure and to put all built-in components into operation. We would like to thank our new partner and wish him much success on the upcoming construction sites.